Skip to content

History of Microsoft Project

io.github.HorizunGroup/horizun-msproject-mcp · Registry status: active

Report data on this entry

Every published change to this entry, most recent first.

Changes
2026-10-03Declared version: 1.5.0 → 1.6.0
2026-10-03Last changed in the registry (raw): 2026-10-01 → 2026-10-02
2026-10-03First listed in the registry (raw): 2026-10-01 → 2026-10-02
2026-10-03Connection paths (source structure): {"packages":[{"registryType":"nuget","identifier":"HorizunMsProjectMcp","version":"1.5.0","transport":"stdio","environment":[],"additional_arguments_declared":false}],"remotes":[]} → {"packages":[{"registryType":"nuget","identifier":"HorizunMsProjectMcp","version":"1.6.0","transport":"stdio","environment":[],"additional_arguments_declared":false}],"remotes":[]}
2026-10-03Package versions (raw): 1.5.0 → 1.6.0
2026-10-02Declared version: 1.4.1 → 1.5.0
2026-10-02Last changed in the registry (raw): 2026-09-28 → 2026-10-01
2026-10-02First listed in the registry (raw): 2026-09-28 → 2026-10-01
2026-10-02Connection paths (source structure): {"packages":[{"registryType":"nuget","identifier":"HorizunMsProjectMcp","version":"1.4.1","transport":"stdio","environment":[],"additional_arguments_declared":false}],"remotes":[]} → {"packages":[{"registryType":"nuget","identifier":"HorizunMsProjectMcp","version":"1.5.0","transport":"stdio","environment":[],"additional_arguments_declared":false}],"remotes":[]}
2026-10-02Package versions (raw): 1.4.1 → 1.5.0
2026-09-29Declared version: 1.2.1 → 1.4.1
2026-09-29Last changed in the registry (raw): 2026-09-23 → 2026-09-28
2026-09-29First listed in the registry (raw): 2026-09-23 → 2026-09-28
2026-09-29Connection paths (source structure): {"packages":[{"registryType":"nuget","identifier":"HorizunMsProjectMcp","version":"1.2.1","transport":"stdio","environment":[],"additional_arguments_declared":false}],"remotes":[]} → {"packages":[{"registryType":"nuget","identifier":"HorizunMsProjectMcp","version":"1.4.1","transport":"stdio","environment":[],"additional_arguments_declared":false}],"remotes":[]}
2026-09-29Package versions (raw): 1.2.1 → 1.4.1
2026-09-24Declared version: 1.1.0 → 1.2.1
2026-09-24Last changed in the registry (raw): 2026-09-22 → 2026-09-23
2026-09-24First listed in the registry (raw): 2026-09-22 → 2026-09-23
2026-09-24Connection paths (source structure): {"packages":[{"registryType":"nuget","identifier":"HorizunMsProjectMcp","version":"1.1.0","transport":"stdio","environment":[],"additional_arguments_declared":false}],"remotes":[]} → {"packages":[{"registryType":"nuget","identifier":"HorizunMsProjectMcp","version":"1.2.1","transport":"stdio","environment":[],"additional_arguments_declared":false}],"remotes":[]}
2026-09-24Package versions (raw): 1.1.0 → 1.2.1
2026-09-23Declared version: 1.0.2 → 1.1.0
2026-09-23Last changed in the registry (raw): 2026-08-04 → 2026-09-22
2026-09-23First listed in the registry (raw): 2026-08-04 → 2026-09-22
2026-09-23Connection paths (source structure): {"packages":[{"registryType":"nuget","identifier":"HorizunMsProjectMcp","version":"1.0.2","transport":"stdio","environment":[],"additional_arguments_declared":false}],"remotes":[]} → {"packages":[{"registryType":"nuget","identifier":"HorizunMsProjectMcp","version":"1.1.0","transport":"stdio","environment":[],"additional_arguments_declared":false}],"remotes":[]}
2026-09-23Package versions (raw): 1.0.2 → 1.1.0
2026-09-08Connection paths (source structure): – → {"packages":[{"registryType":"nuget","identifier":"HorizunMsProjectMcp","version":"1.0.2","transport":"stdio","environment":[],"additional_arguments_declared":false}],"remotes":[]}
2026-08-26Description (raw): – → Audit, reschedule and author Microsoft Project schedules. No Java, no Project install.
2026-08-16Last changed in the registry (raw): – → 2026-08-04
2026-08-16First listed in the registry (raw): – → 2026-08-04
2026-08-16Registry status message (raw): – → –
2026-08-16Schema version of the raw record (raw): – → https://static.modelcontextprotocol.io/schemas/2025-12-11/server.schema.json
2026-08-16Icon formats (raw): – → –
2026-08-16Environment variable descriptions (raw): – → –
2026-08-16Environment variable formats (raw): – → –
2026-08-16Delivery form (raw): – → package
2026-08-16Remote hosts (raw): – → –
2026-08-16Remote URLs (raw): – → –
2026-08-16Runtime hints (raw): – → –
2026-08-16Package versions (raw): – → 1.0.2
2026-08-16Package identifiers (raw): – → HorizunMsProjectMcp
2026-08-16Repository subfolder (raw): – → –
2026-08-16Repository platform (raw): – → github
2026-08-16Path environment variables (raw): – → –
2026-08-16Required secret headers (raw): – → –
2026-08-06Declared version: – → 1.0.2
2026-08-06Repository URL listed: – → yes
2026-08-06Path argument present: – → no
2026-08-06Execution location: – → local
2026-08-06Required secrets declared: – → no
2026-08-06Package registries (raw): – → nuget

This view pages forward and states no total: individual rows are dropped only at output time when their evidence is missing. A counted total would be larger than what is shown.

tracevero · https://tracevero.com/mcp/io-github-horizungroup-horizun-msproject-mcp/aenderungen